Investments in the complex in 2019 exceeded 130 million CZK, of which the revitalization of the outdoor area in the lower part of the complex, which included the renewal of grass areas, construction of playgrounds, game elements and a new gastronomic pavilion, reached 53.8 million CZK. The missing connection with Stromovka was supplemented, and more than 2 kilometers of roads and sidewalks were repaired, including the revitalization of 12,000 square meters of grassy areas.